Solution
Interstate AC installed a complete HVAC system to meet the bank’s needs. This included:
Ductwork and Ventilation
A complex network of ducts was installed above the ceiling, ensuring efficient airflow throughout the space while remaining out of sight.
Rooftop Units and Crane Lifts
Three Carrier packaged rooftop units (RTUs) were installed to provide reliable climate control. The project involved three separate crane lifts, coordinated with Hampton Cranes: one to remove old equipment from the roof, one to set the roof curbs, and one to place the new RTUs.
Efficient Installation
Our team coordinated closely with the general contractor, Marand Builders, to complete the installation without causing any disruptions to the renovation process.